|
21 |
Petition u/S 62 read with Section 86(1)(b) of the Electricity Act, 2003, seeking determination of project specific Tariff for Generation and Supply of Electricity from the 18MW Waste to Energy Power Plant project on refuse derived Fuel (RDF) to be ....... |
30/09/2026 |
Download (152.72 KB) |
|
22 |
Cause List for 01.10. 2026 at 3:00 PM (Hybrid Mode) |
30/09/2026 |
Download (56 KB) |
|
23 |
Cause List for 29 September 2026 at 3:00 PM (Hybrid Mode) |
25/09/2026 |
Download (225.94 KB) |
|
24 |
Cause list for 22.09.2026 at 3:00 PM (Hybrid Mode) |
21/09/2026 |
Download (223.54 KB) |
|
25 |
Petition u/S 86(1)(b) read with Section 63 of the Electricity Act, 2003 read with the DERC (Comprehensive Conduct of Business) Regulations, 2001 for adoption of tariff discovered through Competitive Bidding Process and approval of the Battery Energy ..... |
10/09/2026 |
Download (334.46 KB) |
|
26 |
Petition Under Section 27 of the Energy Conservation Act, 2001 for adjudication of the penalty under Section 26 of the Energy Conservation Act, 2001 by the Adjudicating Officer |
03/09/2026 |
Download (655.83 KB) |